Both Gunnison County Libraries are open to the public. Current hours are Monday-Friday, 9-6PM, Saturday 10-4PM, and Sunday 1-5PM.

Archive Search Results


Showing 1 - 19 of 19 , query time: 0.01s
Thumbnail for 'Work train'
Format:
Image
The D.&R.G. work train at Kent. From left, Dever and Rodgers.
Thumbnail for 'Movable scaffolding'
Format:
Image
Fred P., Hughie and an unidentified man standing next to movable scaffolding. The scaffolding is on train wheels and is pulled by a horse or mule when working on tunnel interiors, e.g. the railway tunnel under Tennessee Pass.
Thumbnail for 'Sitting on crew car'
Format:
Image
Two men sitting on either side of a crew car at Kent.
Thumbnail for 'Work Train'
Format:
Image
The work train at Woody Creek, employing a ditcher with fill cars on either side.
Thumbnail for 'Bridge construction crew'
Format:
Image
Bridge construction crew.
Thumbnail for 'Ditcher at Woody Creek'
Format:
Image
D. & R. G. ditcher at Woody Creek.
Thumbnail for 'Work Train'
Format:
Image
The work train crew during a lighter moment, 1917 (no location given).
Thumbnail for 'Narrow Gauge'
Format:
Image
Construction crew working with narrow gauge track on a bridge built for standard gauge track.
Thumbnail for 'Movable scaffolding'
Format:
Image
Tom Gill, an unidentified man, and Hughie constructing movable scaffolding. The scaffolding is on train wheels and is pulled by a horse or mule when working on tunnel interiors, e.g. the railway tunnel under Tennessee Pass.
Thumbnail for 'Work train'
Format:
Image
The D.&R.G. work train at Kent.
Thumbnail for 'Building of the steel railroad bridge, Eagle, Colorado'
Format:
Image
1930s: Rio Grande Railroad crane dropping section of bridge span into place, guided by men at either end of the span. Eagle River visible at left (Eagle, Colorado). "The Rio Grande Railroad began construction of the steel railroad bridge at Eagle in 1934." -- Those Were the Days, EVE Jan. 22, 2004 p.2 [Title supplied from catalog prepared by the Eagle County Historical Society.]
Thumbnail for 'Working on the tracks'
Format:
Image
Thumbnail for 'Work crew at Kent'
Format:
Image
Three members of a railroad work crew, stopped at the Kent station.
Thumbnail for 'D.&R.G. Ditcher'
Format:
Image
D. & R. G. ditcher 034 at work. Observer on left; work crew on the rail car at right.
Thumbnail for 'Building of the steel railroad bridge, Eagle, Colorado'
Format:
Image
1934: Rio Grande Railroad crane dropping section of bridge span into place. Men at either end of the span are waiting to assist the crane.. Eagle River visible in foreground (Eagle, Colorado).
Thumbnail for 'Work train crew'
Format:
Image
The work train crew posing on the tracks at Kent, 1918. "Often a work train of the 1880s consisted of just the machine and the locomotive, as cabooses were still too scarce to warrant using one on what many managers saw as unnecessary service. As the years went by, it became common practice to attach a caboose, and/or a tool car, to the train. An extra water car was frequently attached to pile driver trains to reduce the number of times the train...
Thumbnail for 'Dave Harper & Ben Gaze'
Format:
Image
Ben Gaze pretending to threaten Dave Harper with an tie tool at the Wolcott station. Dave is taking the threat in stride.
Thumbnail for 'Train derailment'
Format:
Image
Train derailment at Wolcott. Crews are working on removing debris.
Thumbnail for 'Ditcher Crew'
Format:
Image
The D. & R.G. ditcher crew on a work train at Woody Creek, 1917. "Another common type of work train was intended to dig and maintain trackside drainage ditches. The earliest ditching trains used a car with a swinging framework, adjusted by hand, which positioned a toothed, open-ended bucket alongside the track to excavate the ditch as the car was pushed along. This method had many obvious faults. One solution was the steam ditcher, a small steam...