121. New dryer placement
123. Zinc dryer system
Format:
Image
Dick Sayers (l) and John Skinner (r) at the pumping station on 20 level at Gilman.
"Water for the mine came directly from the Eagle River from the pump house, which was just across the ramp coming down the mill incline. About 50 tons of ore per hour went through the mill during each eight-hour shift." Eagle River Valley, p.38
Format:
Image
Emmet Flaherty preparing to pre-heat two blank pieces of hollow drill steel. In the background is an automatic oil-fired forge which will bring these blanks to an exact temperature for forging. From the hollow drill blanks, finished pieces of lugged steel are formed for use in rock drills.
134. Installing new dryer
136. Tailings pond
Format:
Image
Tearing down the existing tailings pipe and stands at the tailings pond below Gilman. Once enough sediment had been released through the bottom of the pipe, new stands were erected to lift the pipe to a higher elevation. Harv Collins is in the center of the photo wearing light colored coveralls.
Format:
Image
New section of pipe and stands for the tailings pond. Trusses with new sections of pipe are being built. Later a safety cable was added along a catwalk , which was used by employees to remove the plugs in the pipe and drain the tailings. Tailings were piped from Gilman as a slurry and, as the slurry dried, it became the same consistency as a fine sand.