Looking upstream at dam toward right abutment from a point about 500 feet downstream from axis at sta. 22+00. Note transition in slopes of cobble fill. Temporary diversion channel was in foreground and has been refilled.
Panorama of dam looking downstream from a point on right side of reservoir about 1200 feet upstream from axis. (Photographic point No. 5). Downstream end of Borrow Pit No. 1 in foreground.
Panorama of dam looking downstream from point on right side of reservoir, about 1200 feet upstream from axis - Photographic point No. 5 - Elevation of fill 7663.5.
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Note portion of cut-off wall covered with canvas in foreground, and panel forms being set for another portion.
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Refilling of cut-off trench in foreground is nearly complete.
Panorama of dam looking upstream from a point on the right abutment about 1/4 mile downstream from axis. (Photographic point No. 2). Refer to Pine R - 248 a&b (D003009).
Panorama of the dam looking upstream from a point on right abutment about 1/4 mile downstream from axis. (Photographic point No. 2). Refer to Pine R - 196 a&b (D003008).
Mosaic of dam looking upstream from a point on the right abutment about 1/4 mile downstream from axis. (Photographic point No. 2). Refer to Pine R - 248 a&b (D003009) and Pine R - 322 a&b (D003010).
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Spiral stariway shaft is seen in foreground. Outlet conduit is completely covered.