Both Gunnison County Libraries are open to the public. Current hours are Monday-Friday, 9-6PM, Saturday 10-4PM, and Sunday 1-5PM.

Archive Search Results


Showing 81 - 100 of 439 , query time: 0.01s
Thumbnail for 'View of left abutment from center of spillway (1)'
Format:
Image
Damsite after stripping - Looking along axis of dam toward left abutment from centerline of spillway. (Photographic point No. 1). Double line of stakes seen in foreground are slope stakes for outlet conduit excavation.
Thumbnail for 'View of dam looking downstream (7)'
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Thumbnail for 'View of left abutment from center of spillway (2)'
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Excavation in foreground is for cut-off trench at right abutment. Large stakes define different sections of the embankment.
Thumbnail for 'View of dam looking downstream (6)'
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Thumbnail for 'Hand-tamping around outlet conduit'
Format:
Image
View of hand-tamping operations around outlet conduit, taken fro the top of the left bank opposite outlet works station 8+85. Note embankment cut-off wall in left background.
Thumbnail for 'Close-up of hand-tamping operations'
Format:
Image
Close-up of hand-tamping operations in backfilling along the outlet conduit from works station 9+25.
Thumbnail for 'Reinforcing outlet conduit with steel'
Format:
Image
Placing reinforcement steel in section of outlet conduit.
Thumbnail for 'Placing concrete in spiral stairway and air shafts'
Format:
Image
Placing concrete in spiral stairway and air shaft from elevation 7641 to 7649.5.
Thumbnail for 'Dome of gate chamber'
Format:
Image
Dome of gate chamber and base of stair shaft after forms were stripped.
Thumbnail for 'Looking downstream in spillway (2)'
Format:
Image
Looking downstream in spillway channel from sta. 14+25. Excavation in foreground is too subgrade. Water appears to have been trapped by rock ridge seen in Pine R - 149.
Thumbnail for 'Looking upstream at spillway excavation (left)'
Format:
Image
Looking upstream at excavation for spillway stilling basin. Taken from right side of spillway at sta. 30+50.
Thumbnail for 'Looking upstream at spillway excavation (right)'
Format:
Image
Looking upstream at excavation for spillway stilling basin. Taken from right side of spillway at sta. 30+50.
Thumbnail for 'Looking upstream in spillway (1)'
Format:
Image
Looking upstream in spillway channel excavation. Shovel is working in stilling basin.
Thumbnail for 'Looking downstream in spillway (5)'
Format:
Image
Looking downstream in spillway channel from sta. 7+00. Le Tourneau in foreground is excavating material upstream from sta. 15+00. Placing of concrete walls can be seen below station 15+00.
Thumbnail for 'Placing riprap next to spillway channel (2)'
Format:
Image
Placing dumped riprap on right side of spillway outlet channel. Darker colored rock was placed during 1939 season.
Thumbnail for 'Panorama of spillway and river channels (right)'
Format:
Image
Panorama looking upstream at spillway and river channels from spillway station 30+50. Placing of drains and fine grading for concrete on vertical curve and stilling basin floor can be seen at left.
Thumbnail for 'Looking upstream at spillway stilling basin (2)'
Format:
Image
Looking upstream at spillway stilling basin from right side of channel at station 30+50. Backfill behind stilling basin walls has been completed. Refer to Pine R - 306
Thumbnail for 'Looking downstream at spillway stilling basin'
Format:
Image
Looking downstream at spillway stilling basin from left side of channel at sta. 26+30. Placing section of stilling basin wall in foreground. Refer to Pine R - 283.
Thumbnail for 'Panorama of spillway and river channels (left)'
Format:
Image
Panorama looking upstream at spillway and river channels from spillway station 30+50. Placing of drains and fine grading for concrete on vertical curve and stilling basin floor can be seen at left.
Thumbnail for 'Looking upstream at spillway'
Format:
Image
Looking upstream at spillway from a point approximately 300 ft. downstream from end of structure. Discharge is estimated at 120-second feet.